Henry Doorly Zoo – Sea Lion Shores
The project includes a 40-foot-long underwater viewing window, realistic Pacific Ocean atmosphere with heated rocks, sandy beaches, underwater kelp forest and a 275,000-gallon saltwater pool.
Owen Industries was also a part of the original sea lion facility built in 1972. Click on the link below for more information on the original sea lion exhibit.
Do You Know the History Of The Owen Sea Lion Pavilion?