HDR Headquarters

The design, fabrication, and installation of the structural steel was a result of the teamwork between HDR, Kiewit, TD2, Davis Erection, H&R and PVS
PVS delivered 1700 tons of steel to build this 10-story building.
The HDR Headquarters project, and PVS Structure’s work in it for the SidePlate system, was detailed in Modern Steel Construction’s March 2020 issue.